_ About Us _
Interior finishing works for 5 buildings inside the Canal Sugar Factory, including walls, f loors, electrical works, and f ire system.
Interior finishing works for 5 buildings inside the Canal Sugar Factory, including walls, f loors, electrical works, and f ire system.
Implementation of sewage
works for the Hayah Karemah
Project.
Slope networks and discharge
line.
The project involves the construction of a three-level administrative building with a total floor area of 450 square meters, encompassing all aspects of construction, both external and internal f inishing, as well as the installation of a central air conditioning system.
Al Arabi Compound
Interior finishing projects for kitchens and the garage within Al Arabi Mall.
Al-Qanah for Sugar
The interior finishing tasks for five structures within the Al-Qanah Sugar Factory encompass the installation of walls, flooring, electrical systems, and fire safety measures
Al-Watania Company
The interior finishing tasks for five structures within the Al-Qanah Sugar Factory encompass the installation of walls, flooring, electrical systems, and fire safety measures

